Business environments change daily making it difficult to keep initiatives aligned with the corporate goals. Without alignment the projects and initiatives fail to deliver value. Our Strategic Alignment: The Key To Project Success white paper addresses these issues and what need to be done to thwart them. |
Look at the
|
If you have not read the book (I strongly recommend you do), it discusses the lessons learned from building the IBM System/360. Yes, the 360. I was still in grade school, and many readers were less than a glimmer in your parent's eye. Amazingly the book continues to sell, topping over 250,000 copies in print, and is still perfectly relevant. That is also the sad part, it appears we have not learned from past failures.
Silver Bullets
The core to building systems is making sure the requirements meet the business needs. Tools can help with the coding and even aligning requirements but none of them will improve productivity an order of magnitude. Neither can they ensure the requirements are the correct. This is the most difficult, time consuming, and error prone portion of any system development project. It still takes people talking to people, gathering the correct requirements, and turning them into a usable system.
|
Silver-bullet tools cannot solve issues on a project. They can address some area but leave others exposed and vulnerable. As the colloquialism goes, they are just trading the devil we know for the devil to be reckoned with.
Progressively Sliding Schedules
"How does a project get to be a year late?
...One day at a time"
A day here, a day there, projects slowly drift later and later. Eventually, someone looks to see the project is months or years late. Realization that the project is late only happens after senior management has the epiphany there is an issue. They set off the alarms as if it happened overnight. However, a project timeline jumping by months on a single problem is rare, if non-existent. Even then, the issue that caused the delay does not manifest without warning—it is a risk that should have been known well in advance. People did not properly identify and understand the threats in the project.
Add to Cart |
Internal Scope Creep
Scope creep introduced by the project team, not the customer, is the stealthy stalker, prowling inside the project ready to swell scope. A form of this, the second system effect, Brooks defines as when a team working on a product for the second time includes "frill after frill and embellishment after embellishment that occur to" them in the first pass of working on the system. At which time the features were only noted, their implementation delayed due to the newness with the product. The second system will bear the brunt of the additional scope as team members add it devoid of any formal change process.
People
It all boils down to people. People cause the schedule to slide, they add scope, and they are over-optimistic. The solution is a team that can realize there is a problem, identify a solution, and implement a solution. Teams need leaders, guiding them through difficult decisions and defining what is needed rather than what is wanted.